continuous manhole to manhole lining
perma-main™
The Perma-Main™ continuous lining system is designed for 8″ – 24″ diameter pipelines. The materials are air inverted through existing manholes and steam cured in as little as 1 ½ hours. The Perma-Main™ Top Gun materials can be installed safely, fast, and efficient. Installations average 300FT to 600FT in length. Transitions from 6″ – 8″ can be accomplished in a single installation. Materials are delivered prewet out, ready for installation. Installation equipment is compact and user friendly.
Perma-main lining system rehabilitates pipes from
8" - 24"
in diameter
continuous lengths up to
600+ft
THIS ZERODIG™ TRENCHLESS SEWER REPAIR PROCESS REHABILITATES the entire mainline pipe - manhole to manhole
Perma-Main™ Lining system is proudly made & supported in the united states of america
the perma-main benefits
- Operates with air only - no large boiler trucks
- compact equipment equals less space required
- Steam cure - less than half the cure time of traditional hot water cure
- contractor friendly
- Pre-impregnated liner delivered project specific
don't dig up your property
rehabilitate your underground sewer lines
A broken or failed sewer line does not mean you have to dig it up to repair it. We manufacture all of the equipment needed to repair underground pipelines without the need for excavation. Our sewer repair pipeline rehabilitation systems can handle pipes that range from 2 inches up to 48 inches in diameter. Experience the Perma-Liner™ difference today and save your road, yard, slab and your sanity!